Our team in Victoria were contacted by one of our HVAC clients on the AFL Grand final public holiday advising that Flavour Makers, a food manufacturing company, chiller had failed.
The chiller was irreplaceable with a cracked heat exchanger. Being a food manufacturing company it was a race against the clock to have the facility operational as soon as possible, every second of downtime has repercussions.
The Active Air team sprung into action to come up with a solution, the team and equipment arrived onsite first thing Tuesday morning. A 200kW Chiller along with a 200Kw Heat Exchanger, a balance tank and connecting hose work were installed and connected into the existing system. The whole system was back operational by lunchtime.
The team did a great job and the client was left extremely satisfied with the quick turnaround of a successful solution.
About The Author: Rebecca Ninkie
More posts by Rebecca Ninkie