logo logo
logo logo
  • Our Equipment

    • Portable Air Conditioning
    • Chillers
    • Split Systems
    • Packaged Air Conditioners
    • Air Handlers
    • High Static Units
    • Power Generation
    • Distribution Boards
    • Cables & Accessories
    • Fuel Cells
    • Lighting
    • Pumps
    • Heating
    • Fans
    • Outdoor Cooling
    • Dehumidifiers
    • Evaporative Coolers
    • Heat Exchangers
    • Cool Rooms & Freezers
  • Industries We Service

    • Events
    • Concrete Batching
    • Warehousing
    • TV Production & Film Sets
    • Server Rooms/ Data Centres
    • Commercial Offices & Retail
    • Industrial & Manufacturing
    • Facility Management
    • Emergency Response
    • Healthcare
    • Schools and Education
    • Food and Beverage
  • About Us

    About Us
    • About Us
    • ActiveEdge
    • Our Services
    • Industries We Service
    • Blog
  • Contact Us
  • 1800 50 50 47

Guides

  1. Home
  2. Our Blog

Category:
  • Guides
  • 18 kW Packaged Unit
  • 220 kW Low Temp Chiller
  • 4.5 kW Portable Air Conditioner
  • Air Handlers
  • Chiller
  • Climate Control
  • Contingency Planning
  • Cooling
  • Data Centres
  • eBook
  • Emergency
  • Events
  • Fans
  • Heat Load Testing
  • Heating
  • Infographic
  • News
  • Packaged Units
  • Portable Air Conditioner
  • Power
  • Power Distribution
  • Power Generation
  • Projects
  • Pumps
  • Resources
  • All Categories
Data Centres, Guides, Resources
May 10, 2021

How to create an air conditioning contingency plan for your server room or data centre

Events, Guides, Power
November 19, 2019

Powering Events – 8 Tips For Savvy Event Managers

Guides
October 17, 2019

5 Questions To Ask When Air Conditioning A Marquee

Guides, Resources
May 25, 2015

Quick Reference Guide For Successful Data Centre HVAC Maintenance

Chiller, Guides, Resources
April 21, 2015

The Secret Life Of Temporary Chillers. Why Companies Like Nudie Juice, Aussie Farmers, Sodexo & More Are Using Them

Guides, Resources
February 27, 2015

The Facility Manager’s Quick Reference Guide To Temporary Air Conditioning

Guides, Resources
February 27, 2015

Doing More With Less: A Facility Manager’s Guide To Stretching HVAC Budgets While Improving Service Delivery

Guides, Resources
January 27, 2015

8 Ways To Avoid Blackouts This Summer

Guides, Resources
December 30, 2014

Heatwave Season Is Coming. Ready?

Guides, Resources
October 15, 2014

Public And Profits At Risk From Heatwaves And Underprepared Businesses

« Older Posts

ARC Authorisation Number: AU15764

  • Portable Air Conditioners
  • Chillers
  • Dehumidiifiers
  • Packaged Units
  • Power Generation
  • Electrical Distribution
Copyright © 2021 Active Air. All rights reserved.Privacy PolicyTerms and Conditions

1800 50 50 47 info@activeair.com.au
adroll_adv_id = "ACXWY5URCVBDHJPA5QY23S"; adroll_pix_id = "DV2TTTOEIVDKDMXW4UKHUU"; adroll_version = "2.0"; adroll_current_page = "other"; adroll_currency = "AUD"; adroll_language = "en_AU";