A mine site in east WA reached out to our Perth team as they had a vessel that required to be recoated. In order to assist with the drying process we were required to provide cooling.
We provided a 96kW package unit and all associated ducting to cool down the vessel whilst it was being recoated.
About The Author: Rebecca Ninkie
More posts by Rebecca Ninkie