It was a typical Saturday morning at Westmead Hospital, bustling with patients and staff, when disaster struck. The main electrical transformer blew up, plunging the entire hospital into darkness and cutting off the air conditioning. Chaos and stress spread rapidly as the hospital struggled to maintain critical operations without power.
In this moment of crisis, Active Air received an urgent call. The hospital needed an emergency solution to restore power and cooling, and they needed it fast. Without hesitation, Active Air sprang into action, ready to tackle the monumental challenge.
The task was daunting: provide 4,000kW of cooling and generators to support both the cooling systems and the hospital’s essential functions. By Saturday afternoon, a plan was in motion. Five large chillers, four powerful generators, and all necessary electrical distribution equipment were mobilized.
Throughout the weekend, the Active Air team worked tirelessly, delivering, installing, and commissioning the equipment. The hospital’s corridors, once filled with anxious whispers, now buzzed with the sounds of machinery and determined engineers. By Sunday evening, the hospital’s power and cooling systems were fully operational again.
The project was a resounding success. Active Air’s swift and efficient response alleviated the hospital’s immediate crisis, ensuring that patients and staff could continue their vital work without further disruption. The weekend’s efforts not only restored functionality but also brought a sense of relief and stability back to Westmead Hospital.