Active Air provided a 350kw boiler and installed this within a warehouse for our client Narellan Pools, using 1 meter inflatable ducting and an insulated buffer tank.
The objective of the install was to heat the area where our client make and cure their fibreglass pools.
Previously Narellan Pools had a heating system that ensured their warehouse space was not too cold for their fibreglass to properly cure during the manufacturing process, however this was damaged during a fire. To ensure minimal disruptions to their production line, they required a fast solution that Active Air was able to provide, making sure there was no heavy delays and inflated costs to their business.